Registration & Commissioning

Once the system is connected and generating power then a series of tests must be performed to complete the G59 process and satisfy the Distribution Network Operator that the system meets the necessary standards.

The performance of the system is also checked against the current sunlight levels to ensure it is performing as expected.

The electrician can then issue the required certification documents.

We also connect the whole system to the internet so that it can be monitored remotely and accurate generation statistics collected.

The system is declared live and registered with Gemserve who issue the MCS certificate.

Final payment is taken and we deliver the commissioning certificate, warranty certificates, MCS certificate and final invoice.

The installation is also registered with NAPIT to meet building regulations.